en keyboard_arrow_down
keyboard_arrow_left See all news

Recent News

10 Feb, 2022 /
Seawork Press FP
Multinational merger secures long-term future
Britain’s leading aluminium shipbuilder, The Wight Shipyard Co. has announced an all-s...
09 Feb, 2022 /
Seawork Press FP
Design contract win for booming USA market
Three new Crew Transfer Vessels (CTVs) to be operated at east coast wind farms in the US...
08 Feb, 2022 /
Seawork Press FP
Entry-level build technicians needed
A leading British manufacturer of high-powered diesel outboard engines for the global ma...
03 Feb, 2022 /
Seawork Press FP
Expanding the model
The growth in the Swedish market for marine electric propulsion systems is the catalyst ...
03 Feb, 2022 /
Seawork Press FP
Holding back the flood
Charles Brand, new exhibitor at Marine Civils at Seawork, recently secured a contract fr...
Seawork Press FP
/ 03 Feb, 2022
keyboard_arrow_left See all news

New ferries to Penang

Up to five specially designed RoPax ferries are to be built for Penang Port Sdn Bhd., Malaysia, to replace the current fleet that has reached its end of life.

Damen Shipyards has been contracted by to build the new vessels which have been specially designed to meet the requirements of the client and its passengers. They will operate on the ferry route that links the Malaysian Peninsula (Butterworth) with Penang Island and its city of George Town, Malaysia’s third largest, just a ten minute journey away.

Designated the Damen Ferry 3508, the new class is designed to carry a maximum of 250 passengers both sitting and standing and 50 vehicles (scooters and motor bikes) in a mix of air-conditioned and open but sheltered areas.

Damen has worked closely with Penang Port Sdn. Bhd. to ensure that their new vessels are configured to meet the needs of their customers in the most efficient and cost-effective way possible. To achieve this Damen conducted a thorough assessment not only of their operations and infrastructure, but also their customers’ wishes.

The new fleet will deliver a combined passenger and vehicular service with departures every 15 minutes in peak periods while, at quieter times of day, it will be perfectly feasible to take a ferry out of service, bringing further cost savings with minimal inconvenience to the travelling public.

Standardising the design also delivers a wide range of operational efficiencies when it comes to redundancy, maintenance, spare parts, crew training and operating costs, not to mention the cost and duration of the build itself without any compromise on performance or quality.

The new ferries will, pandemics permitting, be delivered in mid-2023 ready to serve an estimated 2.5 million pedestrians and 1.5 million two-wheeler vehicles each year. Damen will also be assisting in upgrading the ferry terminals with time-saving technology such as auto berthing and berthing pontoons with fast ramp control.

As part of the overall package, Damen will provide one year’s technical support for Penang Port Sdn. Bhd’s new fleet once it is delivered. To ensure 24/7 operability, Damen will establish a local maintenance hub to keep the vessels in top working condition. Over time personnel will be recruited and trained so that local engineers will have all the skills and knowledge necessary to maintain the vessels into the future.

Gysbert Boersma, Damen’s Regional Director Malaysia, said: “In a joint effort with Penang Port we have achieved a cost-efficient solution while maintaining the daily schedule of the ferries, and we look forward to seeing them making a significant contribution to the area’s transport infrastructure. Furthermore, our maintenance hub will bring local employment and a transfer of skills that will make a positive contribution to the regional maritime sector.”

warning
Warning!
Maintenance is currently underway as of 23:00 GMT Saturday 10 December. Any account information edits will not be saved. during this time. Please refrain from using favouriting and meeting functions during this time as this information will not be saved. The upgrade is expected to finish by 03:00 GMT Sunday 11 December.
Processing. Please wait.
Loading...