
Britain’s leading aluminium shipbuilder, The Wight Shipyard Co. has announced an all-share merger with the complementary multinational shipbuilder OCEA to create a combined group to capitalise on th









Britain’s leading aluminium shipbuilder, The Wight Shipyard Co. has announced an all-share merger with the complementary multinational shipbuilder OCEA to create a combined group to capitalise on th

Three new Crew Transfer Vessels (CTVs) to be operated at east coast wind farms in the US are to be designed by BMT, a leading international multi-disciplinary engineering, management and technology co

A leading British manufacturer of high-powered diesel outboard engines for the global marine industry is implementing its latest recruitment drive to meet increasing demand.

Up to five specially designed RoPax ferries are to be built for Penang Port Sdn Bhd., Malaysia, to replace the current fleet that has reached its end of life.

The growth in the Swedish market for marine electric propulsion systems is the catalyst for further expansion of its direct distribution model for one manufacturer.

Charles Brand, new exhibitor at Marine Civils at Seawork, recently secured a contract from the Department of Infrastructure to build a £17 million tidal flood alleviation scheme for Belfast, Northern

The UK’s largest marine electronics distributor has introduced the BOS brand to their portfolio.

Four newbuild multi-role combat vessels for the Finnish Navy are to be fitted with state-of-the-art davits by Vestdavit, bolstering its position in the wider Nordic naval market.

An 18m USV, the first of its kind, is to be built for a world-leading Geo-data specialist for future North Sea operations.

The third fast crew boat in 12 months, and the tenth vessel overall, has been handed over to Malaysian offshore operator Centus Marine Sdn Bhd by Strategic Marine (S) Pte Ltd

The new build fishing vessel ‘Fruitful Vine BF 240’ has been delivered to her new owners, replacing their previous fishing vessel of the same name, built by the same shipyard in 2010.

Four new coasters are set to be completed in double quick time thanks to the modular installation of plug-and-play steering gear, dropped directly into place as part of the build process.